Development phases
Phased readiness with clear exit criteria
Phases define readiness gates, not dates. Phase 0 is pre-mainnet readiness. Phases 1 to 5 begin at mainnet launch.
Roadmap notice: Phases define readiness gates, not dates. Scope can evolve with engineering, audits, legal constraints, and governance decisions.
-
Phase 0A Current
Baseline
Objective: finalize public-facing pages, navigation, and doc alignment before protocol implementation work begins.
Key deliverables
- Website copy aligned to public docs and the Whitepaper Long.
- Publish and update dates under page titles where required.
- Roadmap page includes a high-level disclaimer.
- Links to public docs and specs are verified.
Exit criteria
- Static site is ready to publish with verified doc links.
- Website content and public docs remain aligned.
-
Phase 0 Current
Testnet
Objective: publish verifiable artifacts and operate a public testnet so readiness can be assessed without private access.
Key deliverables
- Hub chain source code and build instructions.
- Protocol specs and module standards.
- Public testnet with chain ID, genesis file, and validator onboarding steps.
- Reproducible tooling for nodes, indexers, and reporting views.
- Public example entity package on testnet with tagged events, anchors, and derived reports.
- Audit scope and reports for core modules and reference tooling.
- Bug bounty program with disclosure workflow.
- Governance and validator charters plus Treasury policy.
Exit criteria
- Third parties can reproduce entity views and reporting outputs from raw chain data.
- At least one upgrade rehearsal is executed on testnet.
- Security and governance artifacts are published and verifiable.
-
Phase 1 Current
Mainnet
Objective: launch a stable Hub kernel that supports end‑to‑end operation for Hub corporations and Hub nonprofits.
Key deliverables
- Hub chain genesis, validator set, and runtime stability.
- DCHUB gas, staking, and governance primitives.
- Entity registry with IDs, types, metadata, and lifecycle status.
- Hub corporation module v1 and Hub nonprofit module v1.
- Canonical wallets and tagged accounting event schemas.
- Document anchoring and evidence timelines.
- Reference explorer and indexer for entity discovery and event timelines.
Exit criteria
- Core modules audited and deployed with reproducible builds.
- Upgrade process and on-chain governance path tested in controlled upgrades.
- Real entities can register, operate, and produce reproducible reports using only the Hub.
-
Phase 2 Current
Hardening
Objective: harden operations, standards, and tooling so external builders can treat the Hub as infrastructure.
Key deliverables
- Conformance test suite for entity modules, schemas, and indexing compatibility.
- Stable APIs and SDKs for core operations.
- Monitoring, alerting, and incident processes for validators and core services.
- Bug bounty expansion and formalized threat models for the kernel.
- UX primitives such as fee grants that allow stablecoin service fees while execution uses DCHUB.
Exit criteria
- Independent builders can integrate against published schemas and pass conformance tests.
- A first cohort of entities operates end to end on mainnet with real value flows.
-
Phase 3 Current
Ecosystem
Objective: make the Hub easy to use for real organizations and easy to integrate for service providers and apps.
Key deliverables
- IBC stablecoin connectivity and standard treasury patterns.
- App and module registry with metadata, versioning, and security posture disclosures.
- Reference templates for common entity setups.
- Indexer redundancy and data availability patterns.
- Reference governance UI and reporting UI to reduce integration friction.
Exit criteria
- Multiple independent applications and service providers operate in production.
- Stablecoin operations work reliably across inflows, approvals, payouts, and reporting.
-
Phase 4 Current
Adapters
Objective: enable optional external integration without making external systems a kernel dependency.
Key deliverables
- Jurisdiction adapter framework with schemas, proofs, and reference workflows.
- Where feasible, regulated settlement rails (for example CBDC-style instruments) integrated via disclosed gateways and module-based eligibility signals, coordinated through foundation/ResCo adoption work (planned).
- Institutional reporting modules derived from standardized events and anchors.
- Attestation modules and selective disclosure patterns.
- Nonprofit overlays such as donation receipt workflows and sponsorship frameworks.
Exit criteria
- At least one high quality adapter demonstrates external recognition while leaving the kernel unchanged.
- Entities can remain Hub-native or attach adapters without any mandatory graduation path.
-
Phase 5 Current
Maturity
Objective: reach a state where the Hub can operate as long‑lived public infrastructure without a single required operator.
Key deliverables
- Decentralized validator set and governance participation.
- Multiple independent indexers and reference implementations.
- Predictable upgrade cadence and mature incident processes.
- Sustainable foundation processes for standards, audits, and ecosystem support.
Exit criteria
- No single organization is required for the Hub to operate and evolve safely.
- Entity creation and operation are routine with predictable costs and semantics.
-
Optional future phase Current
Advanced
Scope: sub chains, specialized privacy execution, and public instrument models are explored only if real adoption proves they are needed and kernel invariants remain intact.